Cascade Park is four blocks east of Cascade Elementary School. This 10.9 acre park features meandering walking paths, wooded areas, play equipment, swings, and a picnic area.

Construction Projects

Playground Update Project - May 2022

Drawing of the proposed playground at Cascade Park

The Cascade Park playground is planned for relocation and equipment replacement to address aging equipment and flooding issues. The project will also increase the playground's visibility from the neighborhood. The proposed playground will be located further south of the existing loop trail, making it visible from 126th Avenue SE. The play area will have engineered wood fiber surfacing. The area will be expanded to provide a greater variety of equipment to serve all ages.

The playground will include:

  • swings

  • spinner

  • structures with decks, monkey bars, balancing equipment, climbing elements, and slides

The project also includes a paved path and seating areas with benches and a trash receptacle.

Construction will begin in mid-May 2022 and be completed by mid-July, 2022. During the construction time period, Cascade Park will be open but the work site including the existing and proposed playground areas will be closed. 

Cascade Park Expansion Project

Cascade Park Expansion

Expanding Cascade Park was first identified in the 2009 adopted Parks, Recreation and Natural Areas Plan as per the Concept Plan.

Located within the Benson Community Planning Area, this 8,710 square foot developed parcel was acquired in 2016 and increases the existing 10.8 acre Cascade Park to 11 acres.

The house has been demolished and the site graded and seeded, significantly expanding visual access to the park from the adjoining neighborhood.

Cascade Park - Tiffany Park Connector

Image

Connecting Tiffany Park to Cascade Park was first identified in the 2009 adopted Parks, Recreation and Natural Areas Plan.

Located within the Benson Community Planning Area, this 4.9 acre open space parcel, is one step closer to making the connection between the 11 acre Cascade Park to the 6.7 acre Tiffany Park. The Tiffany-Cascade property was acquired in 2012 with project costs being offset with 50% grant funding.

Hours

  • Sunrise to sunset